2RE03-Design/TODO.md
2RE 06fc0fd047 TODO: site published, drop retired-slug idea, keep docs tracked
Records that the site is live, removes the redirect-stub item (no file or link anywhere references victoria.html, cart.html or argent.html), and settles the docs question in favour of keeping memory-bank/ and .clinerules/ tracked. Memory bank synced: deployment is no longer an open question, though the live URL is still unknown.
2026-09-10 19:34:11 +08:00

1.4 KiB

TODO - 2RE03 Portfolio Site

The one place for open work on the site. Check items off as they land, then prune the Done section periodically.

The memory bank keeps only the current priorities and points here, so there is a single source of truth for what is left to do.

Last updated: 2026-09-10.

Now

  • Approve the copy: review the drafted company-voice text page by page.

Assets

  • Favicon (there is none yet).
  • Open Graph / social share image.
  • A real 2RE03 logo, if one exists.

Content

  • Refine any copy that reads wrong, page by page.
  • Populate the galleries with more or real work items.
  • Add per-image captions (they are category-level only right now).

Polish (ideas, not yet agreed)

  • Urban Moto case-study hero is low resolution (450px native at its widest); find or shoot a better crop.
  • Consider moving writtenearplugs.jpg from the Urban Moto grid into the Print gallery.
  • Optimise images to WebP: img/ is 20 MB of the 21 MB repo.
  • Confirm the Forgejo repo (2RE03-Design) is private.

Done

  • Site built: 6 root pages + 10 case studies, green #2ee666 theme, scroll-snap carousels, Web3Forms contact form.
  • Site published.
  • First commit pushed to Forgejo (2RE03-Design, branch main).
  • Temporary refrence/ folder and four unused images removed.
  • Decided to track memory-bank/ and .clinerules/ in the repo.